§ 103E.245 — Preliminary Survey and Preliminary Survey Report

Plain-Language Summary

The engineer examines the petition, surveys the affected area, determines if the project is necessary and feasible based on environmental criteria, checks for impacts on public waters, and prepares a detailed preliminary survey report with maps, cost estimates, and engineering recommendations.

Practical Notes
The preliminary survey report is the foundation for the entire drainage project. It determines whether the project moves forward and shapes all future decisions about design, cost, and environmental impact.