2026 Session Last amended: 2024 session

§ 216I.09 — Permit Amendments

Plain-Language Summary

This section establishes how a facility owner can get approval to modify or upgrade an existing permitted energy facility without going through the full permit process again. Eligible changes include upgrading transmission lines to between 100 and 300 kV without significant environmental impact, and repowering or refurbishing a power plant, wind farm, solar farm, or battery system to improve efficiency without expanding the site footprint or nameplate capacity. The PUC must decide on a permit amendment request within 30 days of receiving the applicant's response to public comments.

Practical Notes
Repowering an existing wind or solar farm — replacing older equipment with more efficient new equipment — is a common industry practice, and this section provides a relatively streamlined approval path if the project stays within the same footprint and interconnection capacity. Facility owners should carefully document that their proposed modifications do not increase nameplate capacity or expand the developed area, because projects that exceed those limits may require a full new permit.