2025 Session
Last amended: 1990 session
§ 103F.187 — Report to Legislature
Plain-Language Summary
After a flood retention project operates for two years, the state must report to the legislature on how well the program worked.
103F.187 REPORT TO LEGISLATURE.
When the project has been in operation for a period of two years, the Board of Water and Soil Resources and the staff engineer shall prepare and deliver a report to the legislature on the program and its consequences with an evaluation of the feasibility and benefit of continuing the project.
History:
History: History:
1990 c 391 art 6 s 24
Practical Notes
The report evaluates whether the pilot program should continue.