In plain language
No one may dispose of solid waste generated in the metropolitan area, or transport it for disposal, in a part of a disposal facility that does not meet the minimum design, construction, and operation requirements for a new disposal facility of that waste type. Each metropolitan county must enforce this prohibition, and a county where a disposal facility is located may also enforce it, with the same penalties, attorney fees, and court costs available under section 115A.86, subdivision 6. The commissioner of the Pollution Control Agency may also enforce this section.
Where this summary and the official text differ, the official text controls.
What this means for you
This section bars metro-generated solid waste from being placed in any portion of a disposal facility that fails to meet the minimum standards for a newly built facility of that waste type. Enforcement runs through the metropolitan counties (and optionally the county hosting the facility) and the Pollution Control Agency, with penalties, attorney fees, and court costs available.Text of the law
No person may place, or transport for placement, solid waste that is generated in the metropolitan area in a portion of a disposal facility that does not comply with the minimum requirements for design, construction, and operation of a new disposal facility for the type of solid waste being disposed. Each metropolitan county shall, and each county in which is located a disposal facility may, enforce this prohibition and may impose penalties and recover attorney fees and court costs to the same extent as for enforcement of a designation ordinance under section 115A.86, subdivision 6. The commissioner of the Pollution Control Agency may enforce this section under section 115.071 or 116.072.
History: 1991 c 337 s 83; 1992 c 593 art 1 s 42